More Cub Work

Last night I went over to the garage to work on the C70. Although I only have a small space to work in, it is adequate. Earlier in the week, I went to Home Depot and bought the materials for my homemade jack-stand. It consisted of two bricks, a bag of dirt, and a tarp. The bricks go on the ground, for height, then part of the tarp, then the bag of dirt, then put the rest of the tarp over it. The tarp is there so that the bag doesn’t puncture. Then I lift the bike onto that pile, and the front wheel is off the ground. The dirt is pliable enough that the bike “settles” into it and is pretty stable. In the future, I’d like to get a center stand, which would make working on the C70 much easier, but the parts for it would cost upwards of $50, so I will just use my “Home Depot Special”.

Anyways, I got a bit of work done. First, I replaced the bulbs in the speedometer, the neutral indicator, and the hi-beam indicator. The panel lights up nicely now. I couldn’t test the hi-beam light yet because I didn’t start the engine, but the neutral light works perfectly. Also, I replaced the air filter, which was all dirty and oily. That was the easy part, and took about 10 minutes.